Inside and Outside

Image
 Day 143 - 32 days til end of October!  So work continues both inside and out.  Inside looks nicer!             Roy is ready for dinner.   And we've got new back splash on part of our kitchen wall. Hard to see it well with all the junk around.  This one is cropped in a bit . Of course, after dinner, we can wash up in our new bathroom sinks Bedroom vanity Public/outer bathroom Meanwhile, they continue working outside to connect our utilities.  Slow process. 

Counter tops and utilites lines

Image
 Day 139.  36 days til end of October.                            The day started out with our counter tops being delivered, and installed!                                   I really like our kitchen island and the surrounding counter top.                                                                             Roy likes it too!                                                Plus we've now got the guest bathroom cabinet and top,                         ...

Utilities!

Image
 Day 134 w/ 41 to go                                                   Will they ever stop digging up dirt piles??                                                   Even got a new machine to dig up more dirt! And this was our street earlier today.  I couldn't even get in to park in the carport. But it is interesting how they are digging up and looking for the utilities. Because they are looking for somewhat fragile lines - sewer, water, gas and electric, they can't dig with big excavators.  Nothing metal that could break the lines.  Instead they pump in high pressure water and then suck out the muck.  Leaves a clean and deep hole. This is the comcast line, which, of course, we don't need.         ...

More digging

Image
 Day 134 AND 41 days until the end of October Note: Our builder, Gordon Stegner, Palace Homes (free plug) whom we really like, said we'd probably be able to move in 7 months after the foundation, so that's the day count (134 is about 4 1/2 months - so we've still got just under 3 months to go.  HOWEVER, he also told us just recently that we should be in by the end of October, so now I get to countdown to then!  41 days to go!  Let's see how close he gets! OK, back to digging.... that excavator guy has become Roy's best friend. He's now digging as we prepare (finally) for the utilities to be connected to the house. Need to connect to gas, electric, water and sewer.  It's a big job which you will see in the next post. There's another use for that excavator, too.  

Cabinets and Doors and.....sewer.

Image
 Day 127.  Work continues.  Some of it is pretty.                                                         All of it is functional.                               And some of it I'd just rather not know that much about!             But you gotta have a sewer line!

Keep on keeping on

Image
Day 114.  Nothing extraordinary to report today, but I'm still impressed with how the work continues.  Some of you may remember that the garage door first delivered was not what we ordered, so after some discussion, we asked for the one we originally ordered.  Normally when I visit, the garage door is up; I finally saw it down after quite a while.  And I do like this one better!                And inside the garage is where they deliver the goods.  Our cabinets came in yesterday!                                                                   There are A LOT of cabinets!                            One place I had not visited was the HVAC space, and the crawl space under the house. ...

Moving along

Image
 Day 108  Last time I wrote, I said we were waiting for the doors to be stained.  Well, that's been done, (waiting til they are installed before posting pics), so now the floor is going in.  Pretty exciting to see the progress.   Starting in the shower.  And of course, there's the rest of the house. The grey tile is for the entry way and kitchen. Most of the house, however, is a type of engineered wood.  This is the study (or bedroom #2).